1 00:00:21,320 --> 00:00:18,910 [Music] 2 00:00:24,440 --> 00:00:21,330 this is the first quarterly coal report 3 00:00:25,700 --> 00:00:24,450 on the Saturn C 5 designated by the 4 00:00:28,609 --> 00:00:25,710 National Aeronautics and Space 5 00:00:30,380 --> 00:00:28,619 Administration as the vehicle which will 6 00:00:32,450 --> 00:00:30,390 launch the Apollo spacecraft to 7 00:00:36,200 --> 00:00:32,460 accomplish circumlunar flight and manned 8 00:00:40,520 --> 00:00:36,210 lunar landings the Saturn C 5 booster or 9 00:00:42,139 --> 00:00:40,530 first stage identified as the s 1 C is 10 00:00:44,119 --> 00:00:42,149 now under joint development by the 11 00:00:47,720 --> 00:00:44,129 George C Marshall Space Flight Center 12 00:00:50,479 --> 00:00:47,730 and the Boeing Company it will have five 13 00:00:52,900 --> 00:00:50,489 f-1 engines producing the total thrust 14 00:00:55,310 --> 00:00:52,910 of seven and a half million pounds 15 00:01:01,599 --> 00:00:55,320 Rocketdyne division of North American 16 00:01:06,830 --> 00:01:04,640 the second stage s2 is under development 17 00:01:11,360 --> 00:01:06,840 by the space systems and information 18 00:01:13,969 --> 00:01:11,370 division of North American Aviation it's 19 00:01:16,780 --> 00:01:13,979 five G two engines using liquid hydrogen 20 00:01:19,940 --> 00:01:16,790 will generate 1 million pounds of thrust 21 00:01:27,280 --> 00:01:19,950 Rocketdyne is also contractor for the j2 22 00:01:32,090 --> 00:01:30,230 the third stage known as s4b 23 00:01:37,510 --> 00:01:32,100 is being developed by Douglas Aircraft 24 00:01:49,160 --> 00:01:37,520 Company it will use a single-engine j2 25 00:01:56,810 --> 00:01:52,399 designed to carry three men the Apollo 26 00:02:00,139 --> 00:01:56,820 spacecraft will ride atop the third 27 00:02:04,670 --> 00:02:00,149 stage to complete the Saturn C 5 space 28 00:02:06,649 --> 00:02:04,680 vehicle this report will highlight major 29 00:02:10,190 --> 00:02:06,659 facilities build-up activity for 30 00:02:15,920 --> 00:02:10,200 manufacture and testing of s1 c s2 and 31 00:02:18,110 --> 00:02:15,930 s4 b stages at the Marshall Space Flight 32 00:02:20,660 --> 00:02:18,120 Center where overall direction of the 33 00:02:23,479 --> 00:02:20,670 Saturn program emanates and where ground 34 00:02:26,270 --> 00:02:23,489 test s 1c stages will be assembled and 35 00:02:29,330 --> 00:02:26,280 tested some plant facilities are now 36 00:02:32,720 --> 00:02:29,340 being rapidly reoriented from the c1 to 37 00:02:34,490 --> 00:02:32,730 the c5 program for example entrances to 38 00:02:37,190 --> 00:02:34,500 the fabrication and assembly buildings 39 00:02:43,460 --> 00:02:37,200 had to be considerably enlarged to allow 40 00:02:45,110 --> 00:02:43,470 movement of the vehicle a new components 41 00:02:48,199 --> 00:02:45,120 transporter is being assembled at 42 00:02:50,509 --> 00:02:48,209 Marshall for use in moving various s1c 43 00:02:53,870 --> 00:02:50,519 parts such as bulkheads and tank 44 00:02:56,120 --> 00:02:53,880 sections from one area to another 32 45 00:02:58,610 --> 00:02:56,130 feet tall the transporter will carry its 46 00:03:05,300 --> 00:02:58,620 loads suspended from hooks on cables at 47 00:03:07,190 --> 00:03:05,310 each side adjacent to the fabrication 48 00:03:09,440 --> 00:03:07,200 area at Marshalls manufacturing 49 00:03:12,349 --> 00:03:09,450 engineering division construction has 50 00:03:14,810 --> 00:03:12,359 begun on an s-1 C combination vertical 51 00:03:18,470 --> 00:03:14,820 assembly station and hydrostatic test 52 00:03:20,360 --> 00:03:18,480 our the 160 foot tall structure will 53 00:03:24,979 --> 00:03:20,370 also be used for cleaning of finished 54 00:03:28,610 --> 00:03:24,989 tanks located near the present Saturn C 55 00:03:31,880 --> 00:03:28,620 1 dynamic test and will be a 360 foot 56 00:03:37,039 --> 00:03:31,890 high C 5 dynamic stand for which design 57 00:03:38,750 --> 00:03:37,049 work has been completed a dynamic test 58 00:03:41,059 --> 00:03:38,760 vehicle assembled at Marshall who will 59 00:03:43,039 --> 00:03:41,069 be suspended in the tower and vibrated 60 00:03:48,800 --> 00:03:43,049 to determine simulated in flight 61 00:03:51,199 --> 00:03:48,810 responses work is progressing on 62 00:03:54,039 --> 00:03:51,209 construction of the static test stand to 63 00:03:56,690 --> 00:03:54,049 be used for captive firing s1c stages 64 00:03:58,550 --> 00:03:56,700 work on the test and foundation and 65 00:04:01,270 --> 00:03:58,560 Control Centre has been underway for 66 00:04:06,190 --> 00:04:03,640 and a contract has been awarded for 67 00:04:08,740 --> 00:04:06,200 construction of the tower itself which 68 00:04:15,309 --> 00:04:08,750 will measure 160 feet square at the base 69 00:04:17,500 --> 00:04:15,319 and stand 405 feet high a contract for 70 00:04:20,289 --> 00:04:17,510 excavation and other preliminary work on 71 00:04:23,409 --> 00:04:20,299 Marshalls single f1 engine static test 72 00:04:25,840 --> 00:04:23,419 and has also been awarded and test and 73 00:04:30,820 --> 00:04:25,850 design has been completed the stand will 74 00:04:33,610 --> 00:04:30,830 be approximately 200 feet high to 75 00:04:35,830 --> 00:04:33,620 full-scale fiberglass mock-ups of s1c 76 00:04:37,810 --> 00:04:35,840 locks and fuel tank bulkheads have been 77 00:04:39,820 --> 00:04:37,820 received by the Marshall Center from 78 00:04:42,460 --> 00:04:39,830 Boeing company's plant at Wichita Kansas 79 00:04:44,700 --> 00:04:42,470 they will become part of the s 1c 80 00:04:47,320 --> 00:04:44,710 mock-up to be assembled at Marshall 81 00:04:50,170 --> 00:04:47,330 consisting of eight gore segments the 82 00:04:55,930 --> 00:04:50,180 bulkhead is 33 feet in diameter and 10 83 00:04:58,360 --> 00:04:55,940 feet high at the center bulkhead 84 00:05:00,400 --> 00:04:58,370 fabrication fixtures such as this device 85 00:05:02,740 --> 00:05:00,410 for cutting and welding gore fitting 86 00:05:05,020 --> 00:05:02,750 connections are now being installed at 87 00:05:07,390 --> 00:05:05,030 Marshall in preparation for fabrication 88 00:05:16,590 --> 00:05:07,400 work all the fixtures were provided by 89 00:05:21,630 --> 00:05:19,380 this Gore trim fixture trims the top 90 00:05:24,450 --> 00:05:21,640 edge of the base and the bottom edge of 91 00:05:26,870 --> 00:05:24,460 the apex of each Gore in order to make a 92 00:05:29,400 --> 00:05:26,880 joint to weld the two pieces together 93 00:05:31,920 --> 00:05:29,410 portable vacuum chucks or holding 94 00:05:40,800 --> 00:05:31,930 devices keep the Gore's in place while 95 00:05:43,110 --> 00:05:40,810 they're being trimmed and welded they 96 00:05:45,720 --> 00:05:43,120 send apex portions are joined on this 97 00:05:48,330 --> 00:05:45,730 Gore welding fixture it's welding 98 00:05:51,060 --> 00:05:48,340 platform is mounted over a pit and can 99 00:05:52,920 --> 00:05:51,070 be tilted 30 degrees making it possible 100 00:05:55,770 --> 00:05:52,930 to weld uphill at all times 101 00:05:57,840 --> 00:05:55,780 welding downward is undesirable because 102 00:06:00,120 --> 00:05:57,850 the weld will run off instead of 103 00:06:07,830 --> 00:06:00,130 puddling as is necessary to form a 104 00:06:10,110 --> 00:06:07,840 strong weld this meridian edge Gore trim 105 00:06:13,260 --> 00:06:10,120 fixture is used for trimming the Gore's 106 00:06:15,990 --> 00:06:13,270 lengthwise a large vacuum chuck from 107 00:06:21,330 --> 00:06:16,000 which air is evacuated by a pump holds 108 00:06:23,400 --> 00:06:21,340 the gore during trimming Gore's are then 109 00:06:25,680 --> 00:06:23,410 placed in this bulkhead assembly welding 110 00:06:28,440 --> 00:06:25,690 station where meridian wells are 111 00:06:30,660 --> 00:06:28,450 performed to join them together the 112 00:06:33,390 --> 00:06:30,670 process is repeated eight times to make 113 00:06:36,000 --> 00:06:33,400 a bulkhead assembly after each core is 114 00:06:39,180 --> 00:06:36,010 welded the turntable welding platform is 115 00:06:41,610 --> 00:06:39,190 rotated 45 degrees to position the next 116 00:06:49,410 --> 00:06:41,620 Gore for the weld head which remains in 117 00:06:52,380 --> 00:06:49,420 place this fixture is used to trim each 118 00:06:55,500 --> 00:06:52,390 bulkhead assembly to a 54 inch diameter 119 00:06:57,930 --> 00:06:55,510 opening at the top and then weld in the 120 00:07:04,380 --> 00:06:57,940 bulkhead closure piece to complete the 121 00:07:07,440 --> 00:07:04,390 bulkhead fabrication process at Wichita 122 00:07:09,510 --> 00:07:07,450 Boeing's 80-acre plant to area is the 123 00:07:13,550 --> 00:07:09,520 site of the company's program for Saturn 124 00:07:16,650 --> 00:07:13,560 c5 support tooling and fabrication work 125 00:07:19,020 --> 00:07:16,660 preliminary milling on c5 booster test 126 00:07:21,660 --> 00:07:19,030 panels was accomplished on these tape 127 00:07:23,820 --> 00:07:21,670 controls Kim Mills with working length 128 00:07:26,730 --> 00:07:23,830 and width of 90 feet and 12 feet 129 00:07:29,219 --> 00:07:26,740 respectively the same skinned mills will 130 00:07:30,450 --> 00:07:29,229 be used for pocket milling required on 131 00:07:32,999 --> 00:07:30,460 the tank and gorse 132 00:07:38,189 --> 00:07:33,009 segment and also for milling integrally 133 00:07:41,010 --> 00:07:38,199 stiffened tank skins fiberglass molds or 134 00:07:43,610 --> 00:07:41,020 layups are being formed here for the 135 00:07:46,559 --> 00:07:43,620 tank end Gore segment bulge form dies 136 00:07:48,990 --> 00:07:46,569 eight such segments will form the ends 137 00:07:53,159 --> 00:07:49,000 for fuel and blocks tanks for c5 138 00:07:56,490 --> 00:07:53,169 boosters the master form for the segment 139 00:07:57,089 --> 00:07:56,500 is fabricated of plaster others Saturn 140 00:08:00,330 --> 00:07:57,099 layups 141 00:08:02,730 --> 00:08:00,340 are made of fiberglass one such 142 00:08:08,010 --> 00:08:02,740 fiberglass mold is this base core 143 00:08:10,379 --> 00:08:08,020 segment welding on all tools to be used 144 00:08:13,200 --> 00:08:10,389 in Boeing's fabrication of parts for the 145 00:08:17,100 --> 00:08:13,210 Saturn c5 program is performed in the 146 00:08:18,900 --> 00:08:17,110 Boeing Wichita weld shop this section 147 00:08:21,629 --> 00:08:18,910 represents the framework for the base 148 00:08:27,330 --> 00:08:21,639 portion of the Bulge formed i-4 tank end 149 00:08:29,219 --> 00:08:27,340 Gore's wire feed welding equipment and 150 00:08:31,710 --> 00:08:29,229 other advanced fabrication techniques 151 00:08:37,440 --> 00:08:31,720 are employed in all areas of Saturn work 152 00:08:39,329 --> 00:08:37,450 at the Wichita facility at Marshall 153 00:08:41,639 --> 00:08:39,339 centers masuo operations in New Orleans 154 00:08:47,510 --> 00:08:41,649 the huge plant is being readied for 155 00:08:52,260 --> 00:08:50,400 when NASA occupied the former Army 156 00:08:54,449 --> 00:08:52,270 Ordnance plant its overhead 157 00:08:57,090 --> 00:08:54,459 superstructure used in manufacture of 158 00:09:00,620 --> 00:08:57,100 tank engines during World War two was 159 00:09:03,630 --> 00:09:00,630 too low for Saturn booster assembly 160 00:09:05,850 --> 00:09:03,640 plant renovation performed under 161 00:09:08,639 --> 00:09:05,860 contract by Mason rust company of New 162 00:09:11,010 --> 00:09:08,649 Orleans consisted largely of removal of 163 00:09:13,769 --> 00:09:11,020 the surplus overhead grillage such as 164 00:09:15,900 --> 00:09:13,779 rails cranes and heat ducts their 165 00:09:18,510 --> 00:09:15,910 removal now allows an overhead clearance 166 00:09:20,430 --> 00:09:18,520 of 40 feet which will provide 6 inches 167 00:09:26,090 --> 00:09:20,440 of clearance for the booster in the 168 00:09:30,480 --> 00:09:28,680 approximately 2,000 tons of steel were 169 00:09:32,760 --> 00:09:30,490 cut out of the overhead superstructure 170 00:09:38,430 --> 00:09:32,770 and hauled from the plant to be sold as 171 00:09:40,890 --> 00:09:38,440 scrap a 50-foot diameter hole had to be 172 00:09:43,199 --> 00:09:40,900 broken in the floor in preparation for a 173 00:09:44,370 --> 00:09:43,209 specially constructed foundation for 174 00:09:49,650 --> 00:09:44,380 Boeing's Massey 175 00:09:51,810 --> 00:09:49,660 100-ton boring mil a wooden retaining 176 00:09:54,210 --> 00:09:51,820 wall with steel spider reinforcement 177 00:09:59,550 --> 00:09:54,220 kept the sides of the 15-foot deep 178 00:10:01,410 --> 00:09:59,560 excavation from caving in the old piling 179 00:10:04,250 --> 00:10:01,420 on which the original floor was mounted 180 00:10:10,530 --> 00:10:04,260 was cut off at the bottom of the hole 181 00:10:13,230 --> 00:10:10,540 and augmented by an additional 116 new 182 00:10:16,860 --> 00:10:13,240 files which were driven 30 feet into the 183 00:10:19,170 --> 00:10:16,870 ground a concrete cap was then poured on 184 00:10:25,110 --> 00:10:19,180 the files and the foundation built up 185 00:10:27,330 --> 00:10:25,120 with concrete and reinforced steel the 186 00:10:29,400 --> 00:10:27,340 boring mill was shipped to masu on eight 187 00:10:35,450 --> 00:10:29,410 flat cars from the Army's Detroit 188 00:10:39,330 --> 00:10:37,470 steam cleaning of the mill was 189 00:10:45,720 --> 00:10:39,340 accomplished after its delivery to the 190 00:10:48,360 --> 00:10:45,730 mature plant emplacement of the mill on 191 00:10:50,460 --> 00:10:48,370 its foundation required extreme care to 192 00:10:54,030 --> 00:10:50,470 ensure proper meshing of gear systems 193 00:10:56,670 --> 00:10:54,040 the turntable weighing over 70 tons was 194 00:10:58,740 --> 00:10:56,680 not large enough for Saturn's needs so 195 00:11:00,720 --> 00:10:58,750 extensions were manufactured to increase 196 00:11:05,070 --> 00:11:00,730 the diameter by approximately twelve 197 00:11:07,980 --> 00:11:05,080 feet at Ingalls shipyard in Pascagoula 198 00:11:11,700 --> 00:11:07,990 Mississippi rolling of aluminum ingots 199 00:11:14,670 --> 00:11:11,710 for wiring segments of s1c stages was 200 00:11:16,650 --> 00:11:14,680 recently performed for Boeing why Rings 201 00:11:22,050 --> 00:11:16,660 will be used to connect bulkheads to 202 00:11:24,630 --> 00:11:22,060 fuel and blocks tank skins in order to 203 00:11:27,090 --> 00:11:24,640 check for cracks dye penetrant tests 204 00:11:29,880 --> 00:11:27,100 were performed on ingots before during 205 00:11:33,380 --> 00:11:29,890 and after the rolling operation ingots 206 00:11:36,480 --> 00:11:33,390 measured 5 inches thick and 34 feet long 207 00:11:38,340 --> 00:11:36,490 the desired final radius of 16 and a 208 00:11:40,830 --> 00:11:38,350 half feet was obtained by rolling a 209 00:11:43,680 --> 00:11:40,840 little at a time and checking it by hand 210 00:11:45,720 --> 00:11:43,690 with a plywood template during rolling 211 00:11:48,180 --> 00:11:45,730 smooth metal collars were placed on the 212 00:11:52,660 --> 00:11:48,190 heavy hydraulically operated rollers to 213 00:12:01,300 --> 00:11:59,200 a test ingot after its normal rolling 214 00:12:03,580 --> 00:12:01,310 operation had been accomplished was 215 00:12:07,270 --> 00:12:03,590 replaced in the rollers and then rolled 216 00:12:09,880 --> 00:12:07,280 beyond 360 degrees in a checkout attempt 217 00:12:15,100 --> 00:12:09,890 to break the ingot even at this extreme 218 00:12:17,050 --> 00:12:15,110 over bend however no breaks occurred the 219 00:12:18,970 --> 00:12:17,060 ends of normally rolled segments were 220 00:12:21,610 --> 00:12:18,980 machined at the shipyard to an 221 00:12:23,470 --> 00:12:21,620 approximate V point when the three 222 00:12:25,930 --> 00:12:23,480 segments which formed the wiring are 223 00:12:29,110 --> 00:12:25,940 placed together for welding the points 224 00:12:31,390 --> 00:12:29,120 of the V's touch and the open V's formed 225 00:12:33,850 --> 00:12:31,400 both inside and outside the ring surface 226 00:12:43,450 --> 00:12:33,860 are filled with metal to form strong 227 00:12:45,750 --> 00:12:43,460 heavy welds from the center out in an 228 00:12:48,040 --> 00:12:45,760 interim weld facility set up at masu 229 00:12:50,290 --> 00:12:48,050 welders were trained to operate the 230 00:12:56,170 --> 00:12:50,300 automatic machines used to make the Wai 231 00:12:58,360 --> 00:12:56,180 ring Wells sonic and x-ray testing of 232 00:13:03,520 --> 00:12:58,370 Wells was conducted to discover any 233 00:13:05,530 --> 00:13:03,530 flaws or cracks the first actual wiring 234 00:13:07,810 --> 00:13:05,540 weld was performed in Boeing's 235 00:13:10,240 --> 00:13:07,820 production weld facility in December 236 00:13:14,700 --> 00:13:10,250 using personnel and equipment formerly 237 00:13:20,350 --> 00:13:17,710 the boring mill at masu was put to its 238 00:13:22,690 --> 00:13:20,360 initial use in a test operation to 239 00:13:25,900 --> 00:13:22,700 machine the first wiring segments to 240 00:13:27,880 --> 00:13:25,910 finish dimensions one segment was cut 241 00:13:30,040 --> 00:13:27,890 into small sections for test pieces 242 00:13:32,560 --> 00:13:30,050 which will be used for experimental 243 00:13:35,140 --> 00:13:32,570 welding to determine if the wiring can 244 00:13:38,080 --> 00:13:35,150 be welded after it is machined rather 245 00:13:39,670 --> 00:13:38,090 than before following the tests the 246 00:13:42,190 --> 00:13:39,680 three segments will be welded together 247 00:13:50,000 --> 00:13:42,200 to determine the feasibility of welding 248 00:13:54,150 --> 00:13:52,200 construction of the foundation for the 249 00:13:58,380 --> 00:13:54,160 new vertical Assembly Building at massĂș 250 00:14:00,990 --> 00:13:58,390 is now well underway the building will 251 00:14:03,750 --> 00:14:01,000 have three tank assembly areas one 252 00:14:08,640 --> 00:14:03,760 chemical tank test area and one stage 253 00:14:11,070 --> 00:14:08,650 vertical assembly area at Rocketdyne 254 00:14:13,620 --> 00:14:11,080 where Saturn's f1 engines are being 255 00:14:15,930 --> 00:14:13,630 developed inspection of the engines 256 00:14:18,480 --> 00:14:15,940 modified sixteen to one thrust chamber 257 00:14:21,030 --> 00:14:18,490 extension skirt after its first short 258 00:14:23,070 --> 00:14:21,040 duration firing showed that collapsing 259 00:14:27,840 --> 00:14:23,080 and longitudinal buckling have been 260 00:14:30,570 --> 00:14:27,850 eliminated in this design a new exhaust 261 00:14:33,420 --> 00:14:30,580 manifold now being employed on the f1 is 262 00:14:35,850 --> 00:14:33,430 smaller and more circular in shape than 263 00:14:38,460 --> 00:14:35,860 the previous design this configuration 264 00:14:40,620 --> 00:14:38,470 is intended to reduce the axial loading 265 00:14:42,750 --> 00:14:40,630 on the skirt support flange which 266 00:14:49,170 --> 00:14:42,760 results in membrane stresses in the 267 00:14:51,900 --> 00:14:49,180 manifold shell rocket dines new model 268 00:14:55,020 --> 00:14:51,910 one LOX pump has been undergoing tests 269 00:14:57,210 --> 00:14:55,030 at Santa Susana in this test setup a 270 00:14:59,780 --> 00:14:57,220 pipe is connected to the top of the pump 271 00:15:02,520 --> 00:14:59,790 permitting testing with a direct flow 272 00:15:04,080 --> 00:15:02,530 pump performance is then compared with 273 00:15:05,850 --> 00:15:04,090 performance when the pump is flowed 274 00:15:13,440 --> 00:15:05,860 through the normal inlets in the elbows 275 00:15:15,570 --> 00:15:13,450 the f1 heat exchanger designed to 276 00:15:17,940 --> 00:15:15,580 provide pressurization for the LOX and 277 00:15:20,070 --> 00:15:17,950 fuel tanks has been tested a number of 278 00:15:26,310 --> 00:15:20,080 times at components test lab number 279 00:15:28,890 --> 00:15:26,320 three several injector designs such as 280 00:15:30,600 --> 00:15:28,900 this LOX dispersion injector have been 281 00:15:34,620 --> 00:15:30,610 tested in an effort to increase 282 00:15:36,990 --> 00:15:34,630 combustion stability margins other 283 00:15:40,500 --> 00:15:37,000 designs tested include the baffled 284 00:15:44,340 --> 00:15:40,510 divergent ring injector low fuel Delta P 285 00:15:49,680 --> 00:15:44,350 injector 21 compartment baffled injector 286 00:15:52,320 --> 00:15:49,690 and the divergent ring injector as part 287 00:15:53,820 --> 00:15:52,330 of the LOX dome oscillation study tests 288 00:15:56,160 --> 00:15:53,830 have been conducted on rocket dean's 289 00:15:58,770 --> 00:15:56,170 high flow test bench at varying 290 00:16:02,340 --> 00:15:58,780 pressures this data will be evaluated 291 00:16:05,070 --> 00:16:02,350 and compared with data from hot testing 292 00:16:07,320 --> 00:16:05,080 a full-scale f1 engine mock-up has been 293 00:16:09,390 --> 00:16:07,330 delivered by Rocketdyne to the Marshall 294 00:16:12,240 --> 00:16:09,400 Center where it was mounted vertically 295 00:16:14,580 --> 00:16:12,250 for tests and a gimbal expand later 296 00:16:23,070 --> 00:16:14,590 it'll be mounted in a partial mock-up of 297 00:16:25,320 --> 00:16:23,080 the s1 see thrust structure final 298 00:16:26,940 --> 00:16:25,330 assembly of saturn s2 stages will be 299 00:16:29,670 --> 00:16:26,950 accomplished at the new Seal Beach 300 00:16:32,300 --> 00:16:29,680 California facility of North Americans 301 00:16:35,580 --> 00:16:32,310 space and Information Systems Division 302 00:16:37,620 --> 00:16:35,590 construction began in August s and I D 303 00:16:39,750 --> 00:16:37,630 personnel occupied a portion of the 304 00:16:41,910 --> 00:16:39,760 facility's bulkhead fabrication building 305 00:16:46,710 --> 00:16:41,920 in December to coordinate tooling 306 00:16:48,210 --> 00:16:46,720 installation this one 248 scale model of 307 00:16:50,250 --> 00:16:48,220 the seal Beach vertical assembly 308 00:16:53,970 --> 00:16:50,260 facility is being used to evaluate 309 00:16:56,100 --> 00:16:53,980 proposed s2 assembly sequences and to 310 00:16:58,710 --> 00:16:56,110 check integration of tools facilities 311 00:17:03,270 --> 00:16:58,720 material handling devices and booster 312 00:17:05,460 --> 00:17:03,280 components production tooling for use at 313 00:17:08,580 --> 00:17:05,470 seal Beach an assembly and welding of s2 314 00:17:11,460 --> 00:17:08,590 bulkheads is now being fabricated at s 315 00:17:16,010 --> 00:17:11,470 and IDs Downey plant delivery of weld 316 00:17:20,670 --> 00:17:18,450 construction of s and ID's el Toro 317 00:17:23,040 --> 00:17:20,680 facility for high energy forming of 318 00:17:25,410 --> 00:17:23,050 bulkhead gora segments and high energy 319 00:17:29,280 --> 00:17:25,420 sizing of bulkheads has been virtually 320 00:17:31,290 --> 00:17:29,290 completed a master mold for bulkhead 321 00:17:34,170 --> 00:17:31,300 gore segment tooling has been used at 322 00:17:36,840 --> 00:17:34,180 Downey to form a master facility tool an 323 00:17:39,120 --> 00:17:36,850 over pressed template and soft tooling 324 00:17:43,710 --> 00:17:39,130 for the high energy forming program at 325 00:17:46,110 --> 00:17:43,720 El Toro high energy forming dyes are 326 00:17:49,560 --> 00:17:46,120 being machined from rough formed steel 327 00:17:51,930 --> 00:17:49,570 using scape machining techniques these 328 00:17:54,480 --> 00:17:51,940 dies due to their size shape and weight 329 00:17:57,270 --> 00:17:54,490 could not be machined by conventional 330 00:17:58,920 --> 00:17:57,280 methods in February the forming dyes 331 00:18:04,850 --> 00:17:58,930 will be delivered to the El Toro 332 00:18:09,660 --> 00:18:07,320 another major construction activity 333 00:18:12,210 --> 00:18:09,670 under way for the s2 program is 334 00:18:15,850 --> 00:18:12,220 preparation for a new static test end 335 00:18:17,950 --> 00:18:15,860 called cooker for at Santa Susana 336 00:18:25,779 --> 00:18:17,960 the coca one test and is also being 337 00:18:27,630 --> 00:18:25,789 modified for s2 1/4 scale s2 test tank 338 00:18:30,370 --> 00:18:27,640 has recently been fabricated and 339 00:18:32,230 --> 00:18:30,380 hydrostatically tested at Downey to 340 00:18:36,909 --> 00:18:32,240 prove the design integrity of the 341 00:18:39,070 --> 00:18:36,919 insulation system 1/4 scale working 342 00:18:42,220 --> 00:18:39,080 model of one of the 3 umbilical arms 343 00:18:47,620 --> 00:18:42,230 required to service the s2 stage has 344 00:18:50,259 --> 00:18:47,630 also been completed Cornell aeronautical 345 00:18:52,840 --> 00:18:50,269 laboratory in Buffalo New York has 346 00:18:56,080 --> 00:18:52,850 concluded a series of tests for s and ID 347 00:18:58,090 --> 00:18:56,090 to determine the s2 s base environment 348 00:19:00,700 --> 00:18:58,100 in terms of temperature heating rates 349 00:19:02,529 --> 00:19:00,710 and pressure distribution and to 350 00:19:05,649 --> 00:19:02,539 establish the optimum deflector and 351 00:19:09,159 --> 00:19:05,659 shrouding arrangement for the stages 5j 352 00:19:10,779 --> 00:19:09,169 two engines using a 125th scale model 353 00:19:12,909 --> 00:19:10,789 tests were conducted at a pressure 354 00:19:18,370 --> 00:19:12,919 equivalent to an altitude of 240 355 00:19:20,320 --> 00:19:18,380 thousand feet at Douglas Aircraft 356 00:19:22,779 --> 00:19:20,330 Company where design development 357 00:19:25,870 --> 00:19:22,789 fabrication and testing of the Saturn C 358 00:19:28,690 --> 00:19:25,880 fives third stage s 4 B will be 359 00:19:30,820 --> 00:19:28,700 accomplished structural layout drawings 360 00:19:34,090 --> 00:19:30,830 being prepared by Douglas are nearing 361 00:19:37,330 --> 00:19:34,100 completion and work is underway on 362 00:19:39,669 --> 00:19:37,340 detailed stage structural drawings at 363 00:19:42,340 --> 00:19:39,679 Douglas Sacramento test area where 364 00:19:46,060 --> 00:19:42,350 static tests of the Saturn C one's s4 365 00:19:48,669 --> 00:19:46,070 stage are conducted a new facility for 366 00:19:51,279 --> 00:19:48,679 ground testing of the larger s4 B stage 367 00:19:55,299 --> 00:19:51,289 is being planned the complex will 368 00:19:57,669 --> 00:19:55,309 include static test stands a blockhouse 369 00:20:01,450 --> 00:19:57,679 propellant and high-pressure gas systems 370 00:20:04,060 --> 00:20:01,460 and supporting utilities at Rocketdyne 371 00:20:06,639 --> 00:20:04,070 Santa Susana area buildup of test 372 00:20:11,289 --> 00:20:06,649 facilities continues for the j2 engine 373 00:20:15,149 --> 00:20:11,299 common to s2 and s4 b stages vertical 374 00:20:18,549 --> 00:20:15,159 test and number two is almost complete 375 00:20:21,370 --> 00:20:18,559 at Delta test and number two which will 376 00:20:24,210 --> 00:20:21,380 be used for 500 second runs outside 377 00:20:26,919 --> 00:20:24,220 lakhs run tanks are in place and 378 00:20:28,840 --> 00:20:26,929 fabrication of the 90,000 gallon liquid 379 00:20:29,410 --> 00:20:28,850 hydrogen run vessel is virtually 380 00:20:35,740 --> 00:20:29,420 finished 381 00:20:38,950 --> 00:20:35,750 a hard mock-up of the block 3j2 engine 382 00:20:40,930 --> 00:20:38,960 has recently been completed oriented to 383 00:20:45,430 --> 00:20:40,940 vehicle requirements it represents the 384 00:20:46,180 --> 00:20:45,440 initial flight readiness engine since 385 00:20:48,670 --> 00:20:46,190 the j2 s 386 00:20:52,150 --> 00:20:48,680 first long-duration static test on 387 00:20:54,310 --> 00:20:52,160 October 4th 1962 in which the engine 388 00:20:57,100 --> 00:20:54,320 fired for more than four minutes at full 389 00:21:05,299 --> 00:20:57,110 thrust a number of similar tests have 390 00:21:11,820 --> 00:21:08,400 Saturn c5 vehicles will be launched from 391 00:21:13,650 --> 00:21:11,830 complex 39 in the new NASA area for 392 00:21:18,870 --> 00:21:13,660 which land has been acquired north of 393 00:21:21,480 --> 00:21:18,880 cape canaveral complex 39 covering 394 00:21:24,299 --> 00:21:21,490 30,000 acres and containing two or more 395 00:21:28,350 --> 00:21:24,309 launch pads will embody a new concept in 396 00:21:30,690 --> 00:21:28,360 launch facilities Saturn vehicles will 397 00:21:32,910 --> 00:21:30,700 be completely erected and checked out in 398 00:21:34,890 --> 00:21:32,920 a 48 story tall vertical Assembly 399 00:21:41,520 --> 00:21:34,900 Building about three miles from the 400 00:21:44,700 --> 00:21:41,530 launch site the building will contain 401 00:21:46,799 --> 00:21:44,710 four bays in each of which a Saturn can 402 00:21:49,350 --> 00:21:46,809 be erected mated to the Apollo 403 00:21:52,110 --> 00:21:49,360 spacecraft and check out on a launch 404 00:21:57,600 --> 00:21:52,120 rack which also supports its 400 foot 405 00:21:59,190 --> 00:21:57,610 umbilical Tower the launch ready Saturn 406 00:22:02,370 --> 00:21:59,200 will then be transported to the 407 00:22:08,070 --> 00:22:02,380 launching pad by means of a 2,500 tonne 408 00:22:10,410 --> 00:22:08,080 crawler vehicle at the pad the 20-foot 409 00:22:12,900 --> 00:22:10,420 high crawler will employ its hydraulic 410 00:22:25,960 --> 00:22:12,910 cylinders to lower the rack and vehicle 411 00:22:31,490 --> 00:22:29,060 launching of the Saturn c5 from Cape 412 00:22:34,009 --> 00:22:31,500 Canaveral will be a giant step in the 413 00:22:37,159 --> 00:22:34,019 lunar orbital rendezvous procedure which 414 00:22:42,790 --> 00:22:37,169 has been chosen by NASA as prime mission